Office/Education/R&D Seoul Fire Service Complex
Special Information
Client
Seoul Metropolitan Government(2014)
Site Area
48.950㎡
Floor Area Ratio
41%
Location
110-6 Jingwan-dong, Eunpyeong-gu, Seoul
Construction Area
7,741㎡
Building Scale
Underground 1story, Aboveground 15story
Usage
Office/Education/R&D
Gross Area
23,139㎡
Structure
Reinforced concrete sturcture rahmen construction, Truss structure

Seoul Fire Service Complex is a public agency that provides professional education and training on safety to the citizens and at the same time fostering a global fire talent, being located in Eunpyeong-gu Mulpuraegol. The arrangement of Seoul Fire Service Complex bringings the axis leading from the flow of the city into the ground, with the mass of each program are located horizontally and completing the ridge, situated in a geographically located within the existing premises. And it attracts the flow of the ridges surrounding the valley to the land and starts from work to plan the main building with a circular plane that connects the two valleys.

Starting from the main entrance to greet the first axis of the city flows coming from the Eunpyeong New Town District, buildings with the nature of a public program (main building, welfare building, dormitory, special rescue team, first aid building, guidance building, and comprehensive training tower) were planned. For the improvement of visual relationship with the adjacent hospital and the training facilities, the education training facilities for the trainees are located in the deep of the site. The main building acts as a mediator that connects the civic open space, education and training space, demonstrating is power as a fire administration town fostering a worldclass fire fighter to the maximum.

In addition, by taking into account the step-by-step construction, even if the construction of the next step is not proceeded after completing the first phase of construction, the original appearance of the Fire Administration Town is optimized in the site. In case of the sequential process of the second, third construction, each function is not to be disturbed by each phase of construction.